Tuesday, March 27, 2007

...more and more and more...

Marking, 'bout halfway through

One run ended and was analysed. Saturn500 doing the 12eV SD-2 run. This leaves one run going on Keter, and six ready to make their reappearance once the queueing system has gone through...

Labels: , , , ,

Tuesday, February 27, 2007

Back to it

Meetings to do with seminar feedback today. Very positive.

Finished off Raman marking, then got some papers off Howarth, including one of the last lot, which has been dealt with, also saw anasuya about her marking, which needs swiftly shifting.

Problem class.

One run finished. Saturn500 finished the 40eV SD-1 run, was analysed recoded as 12eV SD-2 and reset off. This was the penultimate 40eV run remaining and means only two non 12eV runs remain to be completed. Also, only one of the SD 12eV slots is yet to be set off.

Labels: , , , , , , ,

Thursday, February 15, 2007

Marking, marking, marking.

Marking

Ok, one run finished too. Saturn500 finished the 40eV SD-C run, was analysed, recoded and set off as SD-1. Analysis brought no grade changes, but SD finally hit the 80% complete mark. overall, just over 89% complete... 23 runs left to finish, eleven of which are currently going.

Marking

Have created a title for my seminar (under great duress) and grabbed a couple of images. Also tried to book the day off from Mill Hill...

Marking for Howarth done.

Labels: , , , , ,

Sunday, February 04, 2007

Another quick note

Two runs finished today.

Saturn500 was the 40eV SD-2 run. This was analysed, recoded and set off as SD-C. This marked the 33 runs left point, meaning if all the runs not yet analysed were run in the eleven slots, they'd be used three times each. It also means that since eleven of them are running, that only twenty-two runs remain to be set off. No grade changes.

Saturn5000 was the 50eV SD+C run. This was analysed, recoded and set off as SD+1. Analysis brought 50eV up to a first, meaning all energies except 12eV are now on a first of one sort or another. 12eV remains a fail.

Labels: , , , , ,

Tuesday, January 23, 2007

A bit done

Problem class has taken up a couple of hours. Demonstrating mathematics with a half written answer sheet. How I love UCL...

The Thesis has also had a bit of attention. History of observations of the aurora, just the timeline, individual bits on particular observations to go in later. I knew that long winded talk I did last year would come in handy at some point...

Saturn500 finished the 40eV GS100m run. This is the last of the 40eV GS runs not being dealt with, so moved it onto the SD runs. 40eV might actually get finished! Analysis of the run complete, no grade changes, but 80% of GS runs now complete, along with 90% BSR runs, 65.7... etc % SD runs and 78.5... etc % of total runs.

Labels: , , , , , , ,